ASHS RELOCATABLE SCHOOL
A temporary relocatable school for Albany Senior High School.
The brief required the design, consent and construction of a school to house 300 students within eight months.
Gareth worked closely with practice director Roy Bloc and was responsible for a large part of the design, developed design and documentation of this project.
The project consisted of 30 modules. 6 x 12 meters, 1 module 3 x 12 meters, 1200 square meters of covered concourse and 500 square meters of gym.
Work was completed in 2008 and the budget was $5,300,000.
Click on an image to view at full scale.